Bathroom Remodel Oct. 2012 Sign In or Register to add photos

« Back to Gallery 53 Photos
old doorway that got removed
0
old vanity and toilet
0
old vanity and light
0
old shower
0
new framing
0
doorway framed in
0
new electrical
0
new plumbing
0
cement board
0
cement board taped
0
heated floor
0
heated floor thermostat
0
drywall hung
0
tile started
0
tile started
0
close up of border
0
tile
0
cutting tile in the rain
0
tile done
0
walls and ceiling of shower
0
tile again
0
more tile
0
paints done light fixture up
0
paint done
0
close up of light fixture
0
new bath fan/light/heater
0
grout done
0
0
floor grouted
0
lights and switches in
0
fixtures in and pulls bars going up
0
0
0
sink and toilet in with all the ADA accessories
0
0
bathroom door all done outside view
0
Bathroom door inside view
0
Bathroom Complete
0
old exterior door
0
new exterior door
0
new door on the inside
0
doorway was 30" wide reframed for a 36" door
0
same with 2nd bathroom door
0
new bedroom door
0
new 2nd bath door
0
hallway view
0
New Exterior Bedroom Door
0
bedroom ext. door from the inside
0
bedroom door all done from the inside
0
2nd bathroom door all done from the inside
0
Kitchen Ext. door all done from the inside
0
Kitchen Exterior door trimmed, caulked and flashed with ADA compliant ramp.
0
Exterior Bedroom door trimmed, caulked and flashed with ADA compliant ramp.